Showing posts with label lightning. Show all posts
Showing posts with label lightning. Show all posts

Saturday, 25 February 2017

Small bathroom progress

It's been a while since I posted about this, and there has been a lot of progress.

The galleries I managed to "make work" here in terrible, terrible Blogger look like they're actually getting worse every day! I have added some captions to the images but they only show over the thumbnails in ALL CAPS now, wtf?

In any case, what Pim has been working on (I am really not doing anything of this anymore, I am due to give birth any day now):

  • Put up electricity for aseo, laundry & kitchen
  • Pipes for aseo & kitchen
  • Tap fittings for aseo
  • Drains for aseo, laundry & kitchen (lots of cutting and digging into the floors here!)
  • Plasterboards for aseo, laundry & kitchen
  • Self-levelling screed / compound / mortar for aseo floor which was very uneven 
  • And he's also been re-setting the tiles on the mesh since I couldn't bend over anymore!

Friday, 23 December 2016

Plans for the back building

We've been mostly planning the next renovation phase: the "powder room*", laundry room, kitchen and dining room.

*What a stupidly euphemistic name. In Spanish we call this aseo:  a small room with a WC and a washbasin, literally a place where you tidy up yourself. I guess powdering might be considered "tidying up", but, really? anyway.

Planning is incredibly important, we've found. We go over things over, and over, and over, and over again and we always find something we were mistaken about, or we had forgotten. It also happens that you change your mind 3 or 4 times, I think, mostly for the better.

We've been mainly focusing on the aseo and the laundry. These are immediately adjacent the main house building (the living room which is a temporary kitchen at the moment), and, with a baby on the way, will come in very handy as you can imagine. The kitchen and dining room can wait since we have functioning ones, temporary and super messy, but functional. The laundry is also functional at the moment, with the laundry machine and also the dishwasher connected there.

So we have been planning the distribution of the aseo, which is no easy task since it is a tiny 1 x 1,2 m room, and we are recycling a door found in the house (72 cm wide). And I did not want the door to swing outwards into the narrow passage/laundry, particularly since you'll have to go up a couple of steps to go into the aseo, and that seems very awkward to me.

We finally chose and ordered a WC (I love how easy it must be to clean this one! all stupid crannies hidden in a smooth ceramic column :)), a vessel sink (with overflow, many vessel sinks do not have one! dangerous...), the tiles (going for Winckelmans gres again, which we're loving), the taps and hardware (also very happy with our choice in the bathroom), and the lamps (going for a bit of a fancy-design thing this time). We'll build the counter for the sink ourselves, of ebonised oak and carrara marble. A wall to wall mirror and possibly some led strip lightning over the moulding on the ceiling and that's all that's necessary. We have also ordered the laundry sink, but I'll talk about that later.

  • WC: Globo Paestum Monolito with an ebonised oak seat
  • Sink: Scarabeo In-Out drop-in
  • Tiles: Winckelmans 5x5 cm black and white square
  • Hardware: Nicolazzi 1477NO70 nero opaco half dome wall mounted + paper holder / towel bar
  • Lamps: Karboxx Escape cube
Obligatory crap-collage
The hardware finish is all wrong! and also wrong tap handles

The colour scheme of the room will be very strictly black and white. I'm quite inspired by razzle dazzle camouflage paint from WWI for this! Really looking forward to it ;)

So far we have received the WC, we will pick up the tiles tomorrow, and we got a dispatch notice for both sinks. Both lamps and taps (bit of a special order) are due in February.

Structural work has already begun, and, as I'm getting large and clumsy, I am not helping with this hard, dusty as fuck work at the moment. Pim's been cutting at the walls with the angle grinder, in all the places where electricity switches & ducts, and pipes of all types have to be built into the wall. No insulation/plasterboard in this building, so lots and lots of cutting!

He's already built the threshold (recycled steel railroad beam + concrete) for the aseo door (this was simply a solid wall before), and begun building the wall that is missing at the moment, between the aseo and the kitchen. He also cut off a chunk of wall between the laundry and the kitchen, because the passage was unnecessarily narrow:

Sunday, 8 March 2015

Lamps



I haven't been posting much. Three main reasons:

1. Most importantly, since the move our productivity has decreased, due to being a bit saturated, sense of urgency gone, it being winter (I think last winter the same happened, I thought it was the cold, but the house is now cozy, so perhaps the darkness), and it's actually difficult to do things when it's already full of furniture and stuff.

2. Even what we do, I don't take many pictures (re: darkness).

3. Lamest of all, blogger app stopped working so there wasn't a straightforward way for me to post pictures from my phone. I just installed Blogaway, let's see how that goes. Edit: great!






It took us a long time to decide which wall  lamps to get for the bedroom and bathroom.

We finally decided, ordered them, received them and installed them today.

The bedroom lamps are dimmable and the led light bulbs are awesome, particularly when dim. They have this crown of prisms thing going on.






The first floor is getting closer and closer to completion!

Friday, 13 June 2014

Ranarp hack

We chose Ranarp lamps for the hallway and the staircase, the large pendant model for the hallway, and the smaller pendant model for the two first landings, halfway to the first floor and on the first floor.

For the next two landings, between the first and the second floor and on the second floor, we have an inclined ceiling, and we did not want to install pendant lamps, but a couple of wall lamps instead.

Ikea - Ranarp clamp spotlight

Unfortunately, I think, as a wall lamp, the Ranarp clamp spotlight model leaves much to be desired. It is a rather decent (for its price, for sure) clamp-on desk model, although I think the chromed clamp doesn't really fit well with the rest (black, golden, white), which is quite handsome. But the attachment to convert it to a wall mounted lamp is poorly designed, and leaves a lamp that sticks out a great deal, with a long cable, switch and plug hanging off it. I understand the cable part will be desirable to many people, but we were looking for a lamp with a smaller profile, to be installed on the wall with no switch or plug visible. Due to the low cost and to keep all staircase lamps in the same series, we decided to buy a couple of Ranarp clamp spotlights and hack them:

Hacked

Materials we used:
  • Ranarp clamp spotlight
  • Candle holder
  • Metal drills (4, 5 and +9mm)
  • Off-white (and a very small amount of black) spray paint
  • x1 5mm bolt and nut
  • x2 4mm brass screws

Materials
on the right: extra materials
on the left: lamp parts used

To make a long story short, I drilled holes on a candle holder plate: two for attaching to the wall with screws, one for the cable, and one for bolting the lamp to it. I removed the clamp part of the lamp, bolted it to the plate and then installed the lamp on the wall (with the help of a plug box).

Detailed explanations below. All the process images are rather dreadful phone snapshots. Right now we're still house renovating, I'll post pictures of the finished staircase once that's available! These will have to do for now:





 

What we did:


The most challenging part was, or could have been, to find a piece we could use as a base to attach to the wall. I thought perhaps at a home decoration store I could find a small metal dish for candles, flat, with straight, low raised edges (so, a very low cylinder, basically). I got very lucky and I found just that in the first store I looked (Casa, in Belgium, also available in Luxembourg, France, Spain, Portugal, Switzerland, Italy and Austria), but I can see how it could get difficult to find the right dish.

Candle holders with a couple of layers of
paint and marks for holes.


The dishes I found were black, and sturdy but thin (steel I would say), 9cm in diameter and about 6mm deep (might have been too shallow for a surface installation, to hide connections and cables within). They had some rubber anti-slip stickers at the base (what would become the surface in this case) and I removed them by pulling them off, then the stubborn residue with turpentine.

I then gave a couple of coats of white spray paint (I used RAL 9001 creamy white - not a perfect match, just what I had on hand), marked and proceeded to drill four holes on each plate. I guess I could better have painted all the layers of paint after drilling, but I didn't.


Drilling holes.


We drilled two holes along a line for screwing to the wall* (5 mm drill - the thickness of the brass screws we were going to use), and perpendicular to those along another imaginary line, one for the cable (9 mm, our largest metal drill, but I had to enlarge the hole with a file, so I would recommend 10 to 12 mm), and another one of 4 mm for the bolt that attaches the lamp to the dish.


Marking the hole positions for the second lamp.


When drilling the larger hole, it is useful to drill a smaller hole first (easier to keep in the right spot) and then use the larger drill. If hacking more than one lamp, it's also useful to drill one and then mark the second with the first as a template.


Filing the raw edges.


Plug box for plasterboard.
I filed the edges of the holes smooth with a round jewellers needle file, and enlarged the 9 mm hole with a larger round file.

Then came two more coats of paint. I covered the cable hole with a little piece of plastic left over from hacking another couple of Ikea lamps, I'll post about those if and when it turns out ok! It is a nice finishing touch but not at all necessary if the edges of the cable hole are filed smooth. The purpose of this piece of plastic is the exact same on the original lamp (Kroby).


*As we were going to install these on plasterboard, we decided to use a plastic box that is normally used to install an electrical outlet on plasterboard. It works perfectly for these lamps, serving as a deep receptacle for cables and connectors. So the holes we drilled on the dish for attachment to the wall were 7 cm apart, the distance dictated by the screws on these orange boxes.


When it comes to the lamp itself, I cut the lamp's cord halfway between the socket and the switch. Not much cable is needed for installation on the wall, and this nice cable can then perhaps be used for another lamp later on.


Cutting the cable.

We removed the bolted lamp holder from the clamp itself. I kept the washers around this bolt too. This was a little hard, we needed a wrench with the help of strong pliers to loosen it at first. It is an 8mm wrench:

Dismantling the clamp.

I used the 5mm bolt and nut (I sprayed the head of the bolt with a little bit of black paint because the silvery tone bothered me, but it is barely visible...). I bolted this piece to the 5mm hole in the plate, using one of the black washers on the visible side, and one of the silvery ones on the inside).

Bolting the attachment part to the plate.

In our case, the long bolt would interfere during the installation, so we cut most of the excess off with a hacksaw:

Shortening the bolt.

Inside of the plate.

We were not even close to finishing the staircase wall, but wanted to install the lamps to have some light, so I painted just around the "socket" before installing them. We threaded the cable through the largest hole but left it hanging, since it is easier to screw the plate to the wall this way. Then we connected the wires and screwed the plate onto the socket box:


The box comes with it's own screws which we removed.
Connecting the wires.

It was important to hold the lamp while screwing to the plate, otherwise the cable might come out too far, with the fabric covering it, which would be too difficult to push back in once installed:

Screwing the plate onto the box.

Then finally the lamp can be clamped to the plate with the golden wingnut, being careful to catch the cable behind the lamp, and it's done!



Sunday, 8 June 2014

Bathroom &

I am afraid all these images are taken with my phone, since it is always around and convenient.
Some leave much to be desired.

We bought a bunch of Ranarp Ikea lamps for the hall
and the staircase, some of them are up and running.

I would have preferred something fancier, but we're on a budget right now.
And these are quite nice I think.

Finally!! the roof guys brought and installed the attic windows.
These windows are Fakro (a Polish company) and they're neat.

Typical Belgian skies.

We're not sure what to do with the brick wall.
The attic is so much brighter.

The bathroom tiles arrived and we picked them up.
Winckelmans stoneware (grès) tiles, we chose 10 cm
hexagons in pearl grey, with green accents to
complement these antique tiles of the same material. 

I have finished the branch chandelier I started a long time ago. I don't remember if I posted about it. Inspired by images found on Pinterest, particularly this one. We gathered the branches around the perimeter of Pim's parent's garden. I will take better images once it hangs in the bedroom and explain the process.
Branch chandelier in progress

Painting in the bedroom is nearly finished
and we started placing the moldings.

I am actually glad they are foam instead
of plaster, I don't want to imagine how difficult
 to place plaster would have been, especially on
 such wonky angles.

The bathtub has been waiting outside for a long time, wrapped.
We finally made some space to bring it in.

We've mainly been working in the bathroom. Once it is finished, we'll probably move in.

All the pipes, drains and water outlets are installed, so is the electricity, and the insulation + plasterboards (these green ones are especial for bathrooms and kitchens) are up.

Now remains, in this order:


  • Removing the floorboards
  • Reinforcing the beams with steel (to strengthen and straighten the floor in order to tile)
  • Placing OSB boards over the floor, with inset for antique tile trim (which are thicker)
  • Tiling the floor
  • Waterproofing around the shower walls & floor
  • Installing the shower tray
  • Tiling the wall
  • Installing the shower glass screen
  • Installing faucets, bath and washbasin, & toilet if we have bought one by then!
  • Fixing plasterboard joins and paint over non-tiled areas

So it is a lot of work and it may take longer than we anticipate.


Removing floorboards.
These are the steel beam reinforcements.
I've been washing the oil residue and painting the steel, on the side that will be exposed after installing, with a rust resistant paint before we place them. They'll be glued (to avoid movement and create a sort of more rigid composite material) and screwed to the existing wooden beams. That's whet the holes are for. After researching the most efficient way to reinforce and straighten the floor for tiling, Pim made a technical drawing and had these custom made out of plate steel.