Showing posts with label court. Show all posts
Showing posts with label court. Show all posts

Friday, 23 December 2016

Insulation II

I realise I never posted about the "finished" result of the insulation of the back building. I say "finished", because we consider it finished for the time being (and we stopped working on it about mid November). The insulation is on, the bricks are on, all gaps are closed, the gutters are on, and this is going to be all for the winter. There is still grouting between the bricks to do, but that will be a summer project. We're now moving on to the inside of the building.

So this is the "finished" result:

Friday, 14 October 2016

Insulation

Next in house project is to insulate the back building on the outside. The width of the court allows us to do this, instead of losing space on the inside (which we've done on the rest of the house), the back building is only 3 metres wide. It also allows us to cover the very messy bricks of this part. The terrace had to be done first since the insulating foam and thin bricks that go on top will overlap the floor.

Pim finished the drains that come from the gutters, and he and his dad had to replace a couple of windowsills still, since they were not deep enough for what the new thickness of the wall will be.

Then Pim removed a layer of pieces of marble someone had attached to the bottom of the wall, washed the flaky paint (painting over moss is never gonna work, people) away with a Kärcher, and filled all gaps and largest unevenness with cement so that the insulation would glue to the wall properly. The insulation has guides to place the bricks, so they have to be placed level and correct (some bricks over windows etc go vertically), this is very important.

So lots of thinking, measuring, then finally cutting a gluing with a special cement glue.

The entire back is now covered in... polystyrene :D looks total class! We still have thinner insulation to glue to the edges of the windows, screw everything down, then glue the tile-bricks.

We can't wait to move on to work on the inside, the kitchen (!!!) and the dining room. We will have to, soon, due to the weather. We've already ordered the tiles for the floor :)

Sunday, 15 March 2015

Hose tap


There it is. Sticking out since this wall still needs a layer of insulation covered by thin bricks. Sometime.

This wall is the driveway / court side of the farthest building, what will be the kitchen and dining room.