First placing concrete L slabs to act as retainer wall for the soil beyond. |
As level as possible. These things weigh 65 kg each. |
Starting the brick wall, the first row is the most difficult. |
Overnight, a cat will always come to your fresh concrete and walk over it. This one however tap danced on it :D |
More layers go faster. |
Here come some stairs. |