Saturday, 9 July 2016

More terrace

Some progress on the terrace:

First placing concrete L slabs to act as retainer wall for the soil beyond.

As level as possible. These things weigh 65 kg each.

Starting the brick wall, the first row is the most difficult.

Overnight, a cat will always come to your fresh concrete and walk over it.
This one however tap danced on it :D

More layers go faster.

Here come some stairs.