I'll edit this later because blogger is giving me lots of grief today.
...
Edited to add captions.
|
This is the "box" Pim made to hide the cables.
The roof in the next room is much lower, and there are
lots of cables, and we thought this to be the best solution.
Here, shown with a layer of green "primer".
We actually just used a green paint that was on offer. |
|
Supervisor |
|
Pim's dad has been working a lot on the back building.
It's cold in there :( there is no heating yet, but he is
putting up all this insulation and closing the gaps. |
|
There was a gas "bias" chimney in here, and no tiles underneath, unfortunately.
Pim filled the sandy hole with concrete. It will mostly be covered by furniture.
This was and will temporarily be the kitchen, and a living room at a later time. |
|
Covering bricks with plaster in the laundry corner. |
|
The laundry corner's other... corner. Already with water
collectors and beginning of outlets. |